Let's Talk
  • LANDY GROUP
  • About
    • Our Story
    • Meet the Team
    • Careers
  • Divisions
    • Advisory
    • Developments
    • Commercial
  • Our Projects
    • Advisory
    • Developments
    • Commercial
  • Community
    • Industry Partners
    • Corporate Sponsorships
  • Insights
    • Case Studies
    • Industry Insights
    • Knowledge Base
    • News & Media
  • Contact

Bruce Highway (Maryborough to Gin Gin) Safety Upgrades (M2GG)

SMEC

TMR – Wide Bay / Burnett

Maryborough to Gin Gin

EOI close: 6 June 2025

Project Scope

Bruce Highway (Maryborough – Gin Gin), preconstruction and design work for priority safety improvements including five sections of WCLT totaling 18 km between Torbanlea and Gin Gin (Ch. 1km to 111km), two high crash intersection upgrades included in the WCLT delivery at Top End Mines Road intersection and Bundaberg-Childers Road intersection, a heavy Vehicle Rest Area at Gin Gin and 50 km of various safety upgrades.

What we did

  • Josh and Kathryn were integral to securing a critical project for SMEC, playing key roles in the successful bid. Josh provided expert strategic advice on win strategies, while Kathryn was tasked with writing 24 detailed CVs, which accounted for 60% of the evaluation weighting. Additionally, both Josh and Kathryn took on win strategy workshops participation and submission review roles, ensuring SMEC’s responses effectively addressed the evaluation criteria and that the win strategy was clearly communicated throughout.
  • Although SMEC was not initially considered the front-runner among the three invited design firms, the team communicated SMEC’s key differentiators to successfully secure the detailed design package for TMR, marking a business critical achievement for the company securing long term program of works for SMEC’s Roads and Transport team.

Evaluation Criteria

  • Technical Skills of Key Team Members (CVs) – 60%
  • Delivery the Service – 25%
  • Relationship Management – 5%
  • Local Benefits – 5%
  • Quality of Deliverables – 5%

LANDY employees

  • Josh Yates – Win Strategy Advisory
  • Kathryn Powis – CV Writing and Submission Review

Client Testimonials

Josh and Kathryn were essential to the success of SMEC’s TMR Bruce Highway Safety Upgrade M2GG detailed design package bid. Their strategic input as part of the bid challenge team, thorough review of the submission, and expert CV writing (which carried a 60% weighting) were key factors in crafting a compelling response.

This win was a significant achievement for SMEC, and we look forward to continuing our long term mutually beneficial relationship with LANDY as our preferred bid specialist.

– David Hogan, Manager Roads and Highways QLD/NT, SMEC Australia.

Copyright c 2025 Landy Group
Designed by Revolution Creative Group

Group of Companies

  • Advisory
  • Developments
  • Commercial

Quick Links

  • About Us
  • Our Projects
  • Clients & Partnerships
  • Insights
  • Privacy Policy

Landy Developments Iso Certifications

Offices

Brisbane

Level 2, 40 Edward St, Brisbane QLD 4000

Gold Coast

4/2 Phillipine Parade, Palm Beach, Gold Coast QLD 4221

Contact

1300 052 639, (1300 0 LANDY)
[email protected]

Landy Development Iso Certifications

Copyright c 2025 Landy Group
Designed by Revolution Creative Group

Copyright c 2025 Landy Group
Designed by Revolution Creative Group

Group of Companies

  • Advisory
  • Developments
  • Commercial

Quick Links

  • About Us
  • Our Projects
  • Clients & Partnerships
  • Insights
  • Privacy Policy

Offices

Brisbane

Level 2, 40 Edward St, Brisbane QLD 4000

Gold Coast

4/2 Phillipine Parade, Palm Beach, Gold Coast QLD 4221

Contact

1300 052 639
[email protected]

Landy Development Iso Certifications

Group of Companies

  • Advisory
  • Developments
  • Commercial

Quick Links

  • About Us
  • Our Projects
  • Clients & Partnerships
  • Insights
  • Privacy Policy

Offices

Brisbane

Level 2, 40 Edward St, Brisbane QLD 4000

Gold Coast

4/2 Phillipine Parade, Palm Beach, Gold Coast QLD 4221

Contact

1300 052 639, (1300 0 LANDY)
[email protected]

Landy Developments Iso Certifications

Copyright c 2025 Landy Group
Designed by Revolution Creative Group