Bielsdown River Bridge Replacement

Client: Bellingen Shire Council

Value: $3.5M

What we did: 

  • Replaced a 1950s timber bridge with a dual lane single-span bridge and offline shared path.
  • Advanced the design of the Super-T bridge and roadworks with the client.
  • Managed subcontractors to deliver the project scope.

Outcomes: 

Replacement of 1950s timber bridge with a dual lane single-span bridge structure, including a dedicated shared path constructed offline to the existing bridge to allow continued access for the community. 

LANDY progressed the internal design of the major Super-T bridge structure and associated roadworks through to completion with the client. LANDY managed a diverse group of subcontractors to deliver the scope for BSC.