Project Scope
- Upgraded tracks, structures and rail systems between Kuraby station and Beenleigh station, providing 4 tracks through the 20km corridor.
- Station upgrades at Kuraby, Trinder Park, Woodridge, Loganlea, Bethania, Edens Landing, Holmview, and Beenleigh.
- Level crossing removals at Kuraby, Woodridge, Bethania, Holmview and Beenleigh.
- Better connected communities through changes to the local road network and improved walking and cycling connections to stations.
- Enabling works for European Train Control System (ETCS).
- Extension of the cattle siding at Holmview.
What we did
With 40% of the tender evaluation weighted to non-price criteria, Josh’s genuine local relationships and strategy optimisation guided the development of a Local Benefits and Social Outcomes project management plan aligned with the Logan region. This approach ensured the mitigation of challenges, such as removing barriers to participation in the project’s construction delivery for the local and Indigenous supply chain and workforce.
Overall Outcomes
In March 2025, ActivUs secured the design and pre-construction contract for the LGC Rail package – a 20km corridor upgrade including track duplication, station modernisation, and level crossing removals. With 40% of the tender evaluation weighted to non-price criteria, Josh’s genuine local relationships and participation optimisation strategy, drove the development of a bespoke Local Benefits and Social Outcomes project management plan aligned with the Logan region ensuring the mitigation of challenges such as removing barriers to participate in the construction delivery of the project for the local and Indigenous supply chain and workforce. The client TMR communicated it was critical to the evaluation of both tendering proponents, and was a significant contributing factor which led to ActivUs’ bid success in securing contract award of the LGC Rail Package Project.